US Yacht Terminal Project
Home » Projects » Waterproofing » Project Waterproofing » US Yacht Terminal Project

US Yacht Terminal Project


Marina is a famous tourist destination in California, USA. The project is close to the yacht dock in the harbor. The project has 1 large foundation slab and 2 small foundation slab with a total waterproof area of 36,000 square meters. The preliminary project material declaration is very strict. This project is also our company's first large project in the United States with an area of more than 10,000 square meters.

The project duration is 8 months, starting in February 2016 and completed in October 2016.

The project innovatively uses several new tapes developed by Canlon in the early 2016, which cooperates well with the on-site construction and effectively meets the customer's expectations for waterproofing.

Difficulties:

1)The foundation slab waterproofing is 3-4 meters below sea level, and there is seawater infiltration in summer

2)The temperature difference between morning and evening in the Los Angeles area is large, and the dimensional stability of the material is relatively high.


Main materials

MBP pre-applied waterproofing membrane, MST self-adhesive tapes


Follow Us:

Products & Solutions

Phone: +86-18861303997
Tel: +86-512-63809938
WhatsApp: 0086-15510097814
Email: albert@canlon.com
Address: No.8, Hengtong Rd, Qidu Town, Wujiang Dist, Suzhou City, 215234, China

Copyright  2024 Jiangsu Canlon Building Materials Co.,Ltd. All Rights Reserved.  苏ICP备11076726号-3

Privacy PolicySiteMap