Project Introduction
The waterproofing project of the Bomi to Linzhi section undertaken by CANLON is located in the Tibet Autonomous Region and is connected to the Linzhi Station of the Lhasa to Linzhi Railway. The line belongs to the Ya'an to Linzhi section approved for construction by the National Development and Reform Commission in 2020. It is a national Class I double-track railway with a new main line length of 1,011 kilometers and a total of 26 stations along the line. The total estimated investment of the project is about 319.8 billion yuan. China State Railway Group Co., Ltd. (hereinafter referred to as the State Railway Group) is responsible for organizing and implementing the project, and Sichuan-Tibet Railway Co., Ltd. was established as the project legal person to be responsible for project management.
Materials Selected:
Self-adhesive waterproof drainage board for railway tunnel use
Drainage board for railway tunnel use
Ordinary waterproof drainage sheet for railway tunnel use
Copyright 2024 Jiangsu Canlon Building Materials Co.,Ltd. All Rights Reserved. 苏ICP备11076726号-3