Recently, the China Construction Industry Association announced the "List of Construction Project Safety Standardization Site Learning and Exchange Projects in 2024", and the JD (Lankao) Logistics Port project, which is responsible for roof system engineering construction by Canlon, was on the list.
On November 20, the second phase II of the distributed photovoltaic power generation project of Suzhou Canlon Polymer New Materials Technology Co., Ltd. (hereinafter referred to as: Canlon Polymer Industrial Park) built by Canlon New Energy was successfully connected to the grid. The project is located in Qidu Town, Wujiang District, Suzhou City, Jiangsu Province. The first phase of the distributed photovoltaic project of Canlon Polymer Industrial Park is 3.94MW. The second phase is 1.2MW, adopting the "local consumption and surplus power grid access" model.
On October 21-22, the 40th Anniversary of the China Steel Structure Association and the 2024 China Steel Structure Conference were held in Beijing. The conference held an award ceremony to commemorate the 40th anniversary of the establishment of the China Steel Structure Association, and awarded the China Steel Structure Association Science and Technology Progress Award and Technology Innovation Award. The "Polymer Membrane Metal Composite Plate and Engineering Application" project completed by CANLON won the 2024 Technology Innovation Award.
Successfully Withstanding Typhoon Yagi's Onslaught! Canlon's TMP Integrated Panels Prove Their Worth in Hainan High-Tech Industrial Park. Typhoon Yagi, the 11th typhoon of the year, is the strongest to hit China this year, and the most powerful since Typhoon Rammasun in 2014.