Suzhou Industrial Park Olympic Sports Center Project
Home » Projects » Waterproofing » Project Waterproofing » Suzhou Industrial Park Olympic Sports Center Project

Suzhou Industrial Park Olympic Sports Center Project

Publish Time: 2024-06-27     Origin: Site


Project Introduction:

Suzhou Industrial Park Sports Center, also known as Suzhou Olympic Sports Center, has a total construction area of about 386,000 square meters. The project is about 2.5 km away from Jinji Lake. The highest annual groundwater level is about 2.6 m. The groundwater is abundant and the engineering environment is extremely complex, which brings great challenges to the construction of underground projects, especially the waterproof design and construction, which has relatively high requirements.


Materials Selected:

Foundation slab: 1.2 mm MBP pre applied waterproof membrane

Foundation deck & blind side wall: a composite waterproof system of 1.5 mm thick white polyurethane waterproof coating + 1.5 mm thick self-adhesive waterproof membrane (light-colored membrane surface)