Karachi Nuclear Power Plant in Pakistan
Home » Projects » Waterproofing » Project Waterproofing » Karachi Nuclear Power Plant in Pakistan

Karachi Nuclear Power Plant in Pakistan

Publish Time: 2024-06-27     Origin: Site


Project Introduction

The total cost is 9.59 billion US dollars. It is the largest nuclear power project in Pakistan to build two million-kilowatt ACP1000 nuclear power units.


Main materials

MBP pre-applied waterproofing membrane

MBBAC self-adhesive waterproofing membrane


Follow Us:

Copyright  2024 Jiangsu Canlon Building Materials Co.,Ltd. All Rights Reserved.  苏ICP备11076726号-3