Boutique Canlon | Classic Case Study of Siphon Drainage Systems – Asia Pulp & Paper Key Industrial Expansion Project
Home » News & Events » Company News » Boutique Canlon | Classic Case Study of Siphon Drainage Systems – Asia Pulp & Paper Key Industrial Expansion Project

Boutique Canlon | Classic Case Study of Siphon Drainage Systems – Asia Pulp & Paper Key Industrial Expansion Project

Publish Time: 2026-06-12     Origin: Site


The Phase II Expansion Project of Asia Pulp & Paper (Shandong) Co., Ltd., for its household paper products, is located in Rizhao Economic Development Zone. It is a key industrial expansion project of the province and city, with a total investment of RMB 1.2 billion and a total construction area of approximately 92,000 square meters. The project mainly involves the construction of a new paper-making plant, a deep processing workshop, an intelligent automated warehouse, and supporting public and environmental protection facilities. It will also build six new high-end household paper production lines. After completion, the company's total household paper production capacity will reach 300,000 tons/year, with an annual increase in output value of over RMB 2.2 billion. This will further strengthen the regional pulp and paper industry cluster and bring significant economic and social benefits.


The automated finished goods warehouse and post-processing workshop of this project adopted the Canlon roof siphon rainwater drainage system solution. The roof catchment area of the automated finished goods warehouse is 10,805㎡, with a total of 6 sets of siphon rainwater systems and 1 set of overflow siphon rainwater system; the roof of the post-processing workshop is 7,375㎡, with a total of 4 sets of siphon rainwater systems.


With years of deep technical expertise, Canlon provided the project with full-process technical support and reliable drainage system solutions. Taking into full account the special characteristics of the paper mill, Canlon optimized the layout and enhanced the functions of the roof drainage system based on the paper mill's production process characteristics and the actual engineering situation. While considering practical applications, Canlon also optimized the design for safety and long-term use, empowering the project with better functionality and service life.



Other classic application cases

Yung-Ta Chemical Rudong Co., Ltd. Joint Plant

Catchment area: 64,957 square meters

Special Materials Plant of Yung-Ta Chemical Rudong Co., Ltd.

Catchment area 33,414㎡


Qingyuan Shengtong Smart Logistics Center

Catchment area 19,450㎡


Anhui Wanyi Technology Mass Spectrometer Project

#3 Production Plant , 5340㎡


Shangluo City Museum, 14,600 square meters